Used Miner Intake Inspection & Repair

Stage one of the refurbishment line: count the batch, open every unit, name the fault, and decide what is worth repairing before anyone spends money. Part of our used miner services.

Per unit

Status recorded against the serial number

Itemized

Quote before any repair starts

3 outcomes

Repair, parts donor, or scrap

Batch-ready

What the inspection actually looks at

Chip and board health

Chip count and domain status per hashboard, missing or dead ASIC chips, and whether a board initialises at all.

Power path

Core-voltage shorts, blown power-stage components, PSU behaviour under load and connector condition.

Mechanical state

Fan bearings and airflow, dust loading, corrosion, cracked heatsinks, damaged headers and loose screws.

Prior repair history

Evidence of previous rework: swapped chips, reflowed boards, bridged joints, mismatched boards or non-original parts.

Triage: what each unit becomes

An inspection is only useful if it ends in a decision. Every unit leaves intake with one of three labels, written down and costed.

OutcomeWhenNext stage
RepairableKnown fault, repair cost below the unit valueChip-level repair, then cleaning and burn-in
Parts donorRepair costs more than the unit is worth, but boards, PSU or fans still workHarvested for spares or sold as a parts lot
ScrapMultiple failed domains, corrosion or a burned board with nothing reusableReported and removed from the batch total

Built for fleets, not single machines

Repair scope after intake

Repair is the same work we do for mail-in customers every day — not a lighter "refurb" pass. Hashboards, control boards and PSUs are handled at component level.

Hashboards

Chip replacement, short-circuit repair, domain rebuild, connector and trace repair. Per-model detail for S21 / T21, Z15 and L9.

Control boards

Boot failures, corrupted firmware, damaged network interfaces, hijacked or locked units.

Power supplies

APW-series PSU diagnostics and repair — APW17 rebuilds, output faults, protection trips.

Cooling

Fan replacement, bearing service, airflow restoration and thermal interface renewal.

How a batch moves through intake

  1. STEP 1

    Send the list

    Model mix, unit counts and serials. Photos of the batch help us plan pallet handling.

  2. STEP 2

    Arrival audit

    Count against the list, open, inspect and classify each unit.

  3. STEP 3

    Report & quote

    Per-unit status, repairable count, parts-donor count, itemized cost.

  4. STEP 4

    Approve & work

    You approve the route, the bench starts, then the batch moves to cleaning and burn-in.

Intake questions

What does the intake inspection cover?
Count against the serial list, then open and inspect each unit for missing or dead chips, core-voltage shorts, power-stage failures, fan and connector damage, corrosion and prior unskilled repairs.
Do you quote before repairing?
Always. The audit report is itemized and you approve before the bench starts.
Repairable versus parts donor — who decides?
We report both options with cost. The decision is yours; we recommend based on repair cost against unit value.
Can you inspect machines someone else repaired?
Yes — normal for fleets coming out of a farm or another service provider. We assess the hardware as it is, not the claimed history.

Send us the serial list

Model mix and unit count is enough to start — the audit report comes back with numbers, not adjectives.