Used Miner Intake Inspection & Repair
Stage one of the refurbishment line: count the batch, open every unit, name the fault, and decide what is worth repairing before anyone spends money. Part of our used miner services.
Per unit
Status recorded against the serial number
Itemized
Quote before any repair starts
3 outcomes
Repair, parts donor, or scrap
Batch-ready
What the inspection actually looks at
Chip and board health
Chip count and domain status per hashboard, missing or dead ASIC chips, and whether a board initialises at all.
Power path
Core-voltage shorts, blown power-stage components, PSU behaviour under load and connector condition.
Mechanical state
Fan bearings and airflow, dust loading, corrosion, cracked heatsinks, damaged headers and loose screws.
Prior repair history
Evidence of previous rework: swapped chips, reflowed boards, bridged joints, mismatched boards or non-original parts.
Triage: what each unit becomes
An inspection is only useful if it ends in a decision. Every unit leaves intake with one of three labels, written down and costed.
| Outcome | When | Next stage |
|---|---|---|
| Repairable | Known fault, repair cost below the unit value | Chip-level repair, then cleaning and burn-in |
| Parts donor | Repair costs more than the unit is worth, but boards, PSU or fans still work | Harvested for spares or sold as a parts lot |
| Scrap | Multiple failed domains, corrosion or a burned board with nothing reusable | Reported and removed from the batch total |
Built for fleets, not single machines
Repair scope after intake
Repair is the same work we do for mail-in customers every day — not a lighter "refurb" pass. Hashboards, control boards and PSUs are handled at component level.
Hashboards
Chip replacement, short-circuit repair, domain rebuild, connector and trace repair. Per-model detail for S21 / T21, Z15 and L9.
Control boards
Boot failures, corrupted firmware, damaged network interfaces, hijacked or locked units.
Power supplies
APW-series PSU diagnostics and repair — APW17 rebuilds, output faults, protection trips.
Cooling
Fan replacement, bearing service, airflow restoration and thermal interface renewal.
How a batch moves through intake
STEP 1
Send the list
Model mix, unit counts and serials. Photos of the batch help us plan pallet handling.
STEP 2
Arrival audit
Count against the list, open, inspect and classify each unit.
STEP 3
Report & quote
Per-unit status, repairable count, parts-donor count, itemized cost.
STEP 4
Approve & work
You approve the route, the bench starts, then the batch moves to cleaning and burn-in.
Intake questions
- What does the intake inspection cover?
- Count against the serial list, then open and inspect each unit for missing or dead chips, core-voltage shorts, power-stage failures, fan and connector damage, corrosion and prior unskilled repairs.
- Do you quote before repairing?
- Always. The audit report is itemized and you approve before the bench starts.
- Repairable versus parts donor — who decides?
- We report both options with cost. The decision is yours; we recommend based on repair cost against unit value.
- Can you inspect machines someone else repaired?
- Yes — normal for fleets coming out of a farm or another service provider. We assess the hardware as it is, not the claimed history.
Send us the serial list
Model mix and unit count is enough to start — the audit report comes back with numbers, not adjectives.